The beginning of 2007 saw an addition to the Gomaco Trolley Company building. A 60 X 63 foot expansion was constructed on the northwest corner of the facility, and it houses three areas, a construction room with an open "pit" where technicians can easily work underneath the trolleys, a paint preparation area, and a paint room.
|
 |
 |
|
Gomaco Trolley Company
(prior to new addition)
|
Gomaco Trolley Company
(after, with new addition on the right side of the photo, past the canopy.)
|
 |
|
|
|
 |
|
Trolleys under construction can easily be maneuvered into the "pit" room on tracks which run through the building.
|
Trolley parts can be prepared for painting, and then painted in this new area of the expansion.
|
 |
|
 |
 |
| The downdraft paint booth removes the paint overspray and fumes through channels in the floor. The air is then carried back to two triple-filtered booths, where it is filtered to EPA standards and sent outside. |
The entire new addition can be seen in this photo. |